AJM United Uses AdaptaSpan at Rouse Hill
Open voids and changing levels can make movement around a construction site difficult. Without a planned access route, workers may be forced to take longer paths or rely on unsuitable temporary solutions.
At a Rouse Hill project in Sydney, AJM United used SafeSmart Access AdaptaSpan to create a temporary walkway across construction voids. The modular system provided a practical route for personnel while work continued below.
AdaptaSpan is designed for temporary walkways and platforms, with modular sections and adjustable supports that can be configured to suit changing site conditions. Its lightweight design also supports efficient installation, repositioning and removal as the project progresses. SafeSmart Acces
By incorporating a dedicated bridge into the site methodology, AJM United helped improve access, reduce unnecessary movement around hazards and keep workers connected between active work areas.
The project demonstrates how the right temporary works solution can make construction sites safer, more efficient and easier to navigate.
Planning access across a void or opening? Talk to SafeSmart Access about a solution for your project.


