0
The Maribyrnong River Sewer Upgrade required crews to reach work areas below steep river embankments in Melbourne. Access needed to support the sewer works and...
The NON-DRILL Temporary to Permanent Add-on provides a way to connect permanent handrail components to compatible temporary NON-DRILL installations. It is an option for projects...
SafeSmart supplied modular bridges and edge protection for construction at Rozelle Interchange. The equipment helped maintain pedestrian routes while work continued around active construction areas....
Maintenance teams in the Hunter Valley needed better access around haul trucks, dozers, graders and water carts. SafeSmart worked with site teams to identify the...
SafeSmart supplied access systems across the Sydney Metro West Central Tunnelling Package, from The Bays towards Sydney Olympic Park. The work covered excavation access, void-edge...
Western Sydney Airport required access equipment for excavation, concrete works and changing construction areas. SafeSmart supplied modular bridges, edge protection, scaffold walkways and custom access...
SmartBridge & SmartStairs: Elevated Temporary Bridge System SafeSmart SmartBridge is designed for major construction sites where temporary access needs to keep pace with the programme....
AdaptaPanel WorkThru Edge Protection New Features SafeSmart’s AdaptaPanel WorkThru gives crews a way to access the workface through edge protection when fixed panels would restrict...
B80 Edge Protection: Design Out Drilling Post-pour drilling should not be the default way to fix temporary edge protection to permanent bridge concrete. Plan suitable...
The short answer is: yes…and no. AdjustaStairs can work as a complete, standalone access system where you’d normally opt for a scaffold stair tower. They’re...