SafeSmart supplied access systems across the Sydney Metro West Central Tunnelling Package, from The Bays towards Sydney Olympic Park. The work covered excavation access, void-edge protection and routes around busy construction areas.
Access across the package
AdaptaPanel protected excavation edges, while AdjustaStairs provided access between changing ground levels at The Bays. Custom steel hop-up platforms supported inspection work along the curved tunnels at Sydney Olympic Park.
Separating pedestrians and site traffic
At The Bays Precinct, SafeSmart designed a Proscaf walkway over a haul road. Builtrite Scaffolding erected the structure to give pedestrians a separate route across the work area.
Read the Scaffold Walkway at The Bays Precinct case study for the walkway dimensions, design and project photos.