0

Central Tunnelling Package

Proscaf walkway over the haul road at The Bays – image 2

SafeSmart supplied access systems across the Sydney Metro West Central Tunnelling Package, from The Bays towards Sydney Olympic Park. The work covered excavation access, void-edge protection and routes around busy construction areas.

Access across the package

AdaptaPanel protected excavation edges, while AdjustaStairs provided access between changing ground levels at The Bays. Custom steel hop-up platforms supported inspection work along the curved tunnels at Sydney Olympic Park.

Separating pedestrians and site traffic

At The Bays Precinct, SafeSmart designed a Proscaf walkway over a haul road. Builtrite Scaffolding erected the structure to give pedestrians a separate route across the work area.

Read the Scaffold Walkway at The Bays Precinct case study for the walkway dimensions, design and project photos.

Discuss site access

Speak with SafeSmart about temporary stairs, edge protection and pedestrian routes.