0

SafeSmart Access and AdjustaStairs: Reaching New Heights in the Maribyrnong River Sewer Upgrade

SafeSmart Access and AdjustaStairs: Reaching New Heights in the Maribyrnong River Sewer Upgrade – image 1

The Maribyrnong River Sewer Upgrade required crews to reach work areas below steep river embankments in Melbourne. Access needed to support the sewer works and be repositioned as the project moved to its next stage.

A modular stair route down the embankment

SafeSmart supplied AdjustaStairs flights that could be linked along the slope. Crane lifting points, folding handrails and adjustable stair angles supported installation and later relocation.

Read the project case study

See the Maribyrnong River Sewer Upgrade case study for the original project account, installation video and site photos.

For another application along a steep spillway, see temporary access stairs at Kangaroo Creek Dam.

Plan embankment access

Discuss your slope profile, landing points and access requirements with SafeSmart.