SafeSmart Symbol Safety Red (RGB) 512 x 512 01

Building

INDUSTRY

HOW WE WORK WITH THE BUILDING INDUSTRY

SafeSmart Access is a trusted provider of height safety solutions to the mining industry, with over 20 years of experience. We work with all contractors, sub-contractors, and suppliers in the building industry from demolition to excavation, through to operations & fitout.

Our comprehensive range of construction work platforms caters for all types of buildings whether it be a high-rise, commercial or industrial buildings. We can provide you with the most effective and efficient access solution to suit your needs.

We understand that in the building industry, time is money. Through collaboration we strive to provide you with the most safe and efficient access solutions possible, to achieve the best possible result for your project.

If you’re looking for a reliable and safe construction working platforms, then browse our product range.

SAFESMART Solutions

MEET THE TEAM

1687476790475

Nathan Joyce

National Sales Manager

Void and Excavation temporary works solution specialist

Arlyn 1

arlyn rendell

Sales Executive

Construction Industry Specialist providing solutions for construction sites across Australia

Kurt H

Kurt hutchison

Sales Executive 

Safety and Efficiency Auditor with a keen focus on Access challenges

Romeo Joyce 2

romeo joyce

Business Development Executive

Construction Industry Specialist providing solutions for construction sites across Australia

On Site Consultation e1729654031252

REQUEST A ON-SITE CONSULTATION

STAY SAFE. STAY SMART.

Advantages of an on-site consultation:

  • Improved work methodologies to increase efficiency and reduced downtime
  • Recommendations based on comprehensive industry knowledge
  • An in-depth audit on how to make your site safer
  • Awareness of a range of product offerings based on current industry standards
  • A more detailed understanding of your unique site challenges

READY TO GET STARTED?

Fill out the form below to request your on-site consultation today!

Our Industry Leading Solutions

Our comprehensive, bespoke, off-the-shelf, and made-to-order designs are created specifically with common access challenges and ease of use in our front of mind.

Consistent collaboration with onsite teams has led the way for our industry-first designs such as our height adjustable platform range that are both user-friendly and cost effective solutions, with seamless integration into your worksite.

ON-SITE GALLERY

SafeSmart Symbol Safety Red (RGB) 512 x 512 01

Data Centres

Data Centre Access Systems for Construction and Maintenance

Data centre projects need access systems that fit the build sequence and the finished facility.

SafeSmart supplies temporary and permanent access for construction, commissioning and maintenance. This includes precast edge protection, bridge crossings, work platforms, stairs and walkways for plant areas.

Access That Works With the Build Programme

Large precast panels, active internal roads and staged service installation can change how crews move around a site.

Access needs to be planned around the work area before it becomes a hold-up. This can include handrails connected through planned panel fixings, a bridge crossing over a service route, or a platform positioned for repeated installation work.

SafeSmart works with builders, design teams and facility representatives to review the access task, available space and installation method.

1783668923788

Temporary Access for Data Centre Construction

20240826 123645

Non-Drill Edge Protection for Precast Panels

Precast panels should not need to be altered after installation just to protect an exposed edge.

Proscaf AW Edwards Huntingwood Bridge (5)

Bridges Across Site Roads and Services

Internal roads, drainage lines and service routes can separate work zones.

20260520 104127

Controlled Access Through Edge Protection

Some tasks require access through temporary edge protection for materials handling, installation or facade work.

Ventia Perth

Platforms and Stairs for Repetitive Work

Installation and commissioning teams often work at the same height for extended periods.

Permanent Access for Plant and Maintenance

Permanent access needs to suit the people who will inspect, service and replace equipment after handover.

SafeSmart can supply access systems for:

Chillers, cooling towers and generators

Switchboards and electrical equipment

Roof and plant-room walkways

Pipework and cable-tray step-overs

Maintenance platforms and stairs

Equipment removal routes

Bring permanent access into the design phase so the finished facility has usable routes to the equipment that requires regular attention.

IMG 3210
20250902 Warringa KingKlampz A4520

From Drawings to an Installable System

Share your drawings or RFQ with the SafeSmart team.

We can review site levels, available space, fixing details, working loads and whether the access system is temporary or permanent. From there, we can recommend suitable products or develop a site-specific arrangement where required.

CASE STUDY

Data Centre Project Experience

CDC’s Eastern Creek data centre project used a custom no-drill edge-protection system that connected to ferrules cast into precast panels.

SafeSmart developed the arrangement with Hindmarsh Constructions and third-party certifiers. The system avoided post-drilling into the completed panels while providing edge protection for crews at roof level.

Proscaf AW Edwards Huntingwood Bridge (5)

Discuss Your Data Centre Access Scope

Send through your drawings or RFQ, along with the area you need to access and the project timing.

SafeSmart can help determine the right access system for construction, commissioning or ongoing maintenance.

Quality is key, when it comes to height access

No matter the stage you’re at on a project, we have a height access solution to keep you safe at height.

Not all products are single-task focused. You’ll find many of our products cover various tasks.

An investment in a quality height access solution is an investment in your health, efficiency, and time.