0

SafeSmart solves a temporary access challenge at Circular Quay, Sydney

Designed by one of the world’s leading architecture firms Foster + Partners, and created by Lendlease, 180 George St will become a centrepiece of a new precinct at Circular Quay.
The Challenge

Designed by one of the world’s leading architecture firms Foster + Partners, and created by Lendlease, 180 George St will become a centrepiece of a new precinct at Circular Quay.

Marr Contracting are providing the cranes and associated equipment for Lendlease, on this prestigious project.

As part of their package, they were required to provide 2 x access bridges, to enable the crane operators to safely access the crane mast from the adjoining building slab. These bridges had to be able to be quickly lifted into position and safely secured to the crane mast cross member.

The Solution

Marr approached SafeSmart Access, as the original developer of crane access bridges. Using our unique SmartSpan system, SafeSmart supplied 1 x 3mL bridge and 1 x 10mL bridge. These bridges had the following features;

  • Constructed from 1mL, 2mL & 3mL modules, join modules together to create a clear span bridge up to 15mL
  • Simply bolt together end to end
  • Bolt on hooks to attach to the crane cross member
  • Bolt on wheel kits
  • Bolt on 2mH handrails with mesh infills
  • 1.2m internal width
  • 2.5kPa SWL

SmartSpan is compliant with AS 1657:2018. SafeSmart now has the product added to their Ramps and Walkways category of this website, with more specification details, as a reference for businesses who may have similar applications.

IMG 3466 1
The Outcome

The finished solution was very stable and safe, a highly satisfactory outcome for both Marr Contracting and Lendlease. Additionally, the modular aspect of the system allows the client to very simply adjust the bridge length and configuration as required for other projects.

Enquiries? Ask SafeSmart now.

Captured process

Case study facts

Building

Industry

Client

Marr Contracting for Lendlease

Location

New South Wales

Status

Installed on site

Capability

Modular crane-access bridges

Delivery Model

Supply of 3 m and 10 m SmartSpan bridges

Material

Material

Related case studies

M4 AdaptaSpan Installation

Temporary Guardrails for Warringah Freeway Sound Walls

SafeSmart Supporting the Western Tunnelling Package at Rosehill

NON-DRILL Handrail at Tamborine Mountain

Related case studies

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Next action

Have a similar access challenge? Talk to SafeSmart about your project.