Open voids and changing levels can make movement around a construction site difficult. Without a planned access route, workers may be forced to take longer paths or rely on unsuitable temporary solutions.
The Challenge

Open voids and changing levels can make movement around a construction site difficult. Without a planned access route, workers may be forced to take longer paths or rely on unsuitable temporary solutions.

Aerial view of the AJM United site showing concrete voids and access routes
The Solution

At a Rouse Hill project in Sydney, AJM United used SafeSmart Access AdaptaSpan to create a temporary walkway across construction voids. The modular system provided a practical route for personnel while work continued below.

AdaptaSpan is designed for temporary walkways and platforms, with modular sections and adjustable supports that can be configured to suit changing site conditions. Its lightweight design also supports efficient installation, repositioning and removal as the project progresses. SafeSmart Acces

AdaptaSpan bridges connecting concrete work areas at the AJM United site
Workers crossing an AdaptaSpan bridge over a concrete void at AJM United
The Outcome

By incorporating a dedicated bridge into the site methodology, AJM United helped improve access, reduce unnecessary movement around hazards and keep workers connected between active work areas.

The project demonstrates how the right temporary works solution can make construction sites safer, more efficient and easier to navigate.

Planning access across a void or opening? Talk to SafeSmart Access about a solution for your project.

A worker using the guarded AdaptaSpan walkway at the AJM United site
Site team reviewing an AdaptaSpan bridge connection at AJM United

Captured process

Case study facts

Building

Industry

Client

AJM United

Location

New South Wales

Status

Installed on site

Capability

Temporary modular walkways

Delivery Model

AdaptaSpan deployment

Material

Material

Related case studies

M4 AdaptaSpan Installation

Temporary Guardrails for Warringah Freeway Sound Walls

SafeSmart Supporting the Western Tunnelling Package at Rosehill

NON-DRILL Handrail at Tamborine Mountain

Related case studies

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Next action

Have a similar access challenge? Talk to SafeSmart about your project.