0

Precast Edge Protection at Eastern Creek

SafeSmart’s edge protection system has successfully overcome a significant edge protection challenge atop of one of the most state-of-the-art data centres of CDC in Eastern Creek. This project is part of the larger Sydney Data Centres Scheme being undertaken with haste and highlights the need for no-compromises, cutting-edge safety measures during construction.
The Challenge

SafeSmart’s edge protection system has successfully overcome a significant edge protection challenge atop of one of the most state-of-the-art data centres of CDC in Eastern Creek. This project is part of the larger Sydney Data Centres Scheme being undertaken with haste and highlights the need for no-compromises, cutting-edge safety measures during construction.

One of the critical safety requirements identified was the need for an edge protection system around the fortress’s roof area. This system would serve to protect workers during the installation of the roof.

Hindmarsh Constructions, in collaboration with SafeSmart Access, identified the need for a custom solution that could be seamlessly integrated into the existing construction methods without necessitating additional structural modifications such as drilling.

Thinking Outside the Box: Precast Edge Protection

Precast Panels and the Quest for Safety Scope

Using precast concrete panels, Hindmarsh uses a well-established methodology for fast and efficient construction. Installing these massive panels requires workers to operate at significant heights, particularly around the roof level.

Traditional edge protection methods often involve drilling into panels, a process that can compromise structural integrity, increase the dangers of silica dust exposure, and weatherproofing—risks no one wants to take when building a data centre.

An out-of-the-box solution was needed to protect crews on top of the data centre.

20240826 123645 scaled e1729747889824
The Solution

Instead of resorting to drilling, which can weaken the panels and introduce silica dust exposure, the proposed system leveraged preset ferrules cast directly into the precast panels. These ferrules act as secure anchor points for handrails, providing the necessary edge protection without any additional holes or modifications.

By using modified clutches, the custom edge protection system ensures that attachments are secure, reducing the potential for human error during installation and mitigating drilling into the structure.

SafeSmart’s engineering team worked closely with Hindmarsh Constructions and third-party certifiers, such as Sellick Consultants, to tailor the system to the project’s specific needs. Data crunching was undertaken on everything from wind loads to mesh design features, ensuring compliance with the stringent AS 4994:2019 standards for temporary edge protection.

Economic Sense: Using Precast Panel Pins

Beyond safety, the custom system offers significant commercial advantages. By eliminating the need for drilling, the solution preserves the integrity of the precast panels, reducing maintenance costs and potential delays.

From the commercial and methodologies presented, engineers at Hindmarsh could see it as a “no-brainer” to save on labour costs for drilling, enhance safety with a reusable edge protection system, and reduce maintenance costs for drilling repairs.

As a win-win for all stakeholders, the system was adopted for immediate installation.

From Delivery to Lifetime Support

Implementation of the edge protection system was smooth and efficient. SafeSmart Access ensured that once the components arrived on site, the Hindmarsh team could hit the ground running with minimal training, with thanks to the robust documentation provided.

But support goes further than that. Training, replacement parts, maintenance, and inspections are all included in the through-life support offered to Hindmarsh. It was peace of mind for Hindmarsh, knowing that their investment would be nurtured over the years to come.

20240826 123033 scaled
The Outcome

Data centre construction has been booming lately, with the need for secure computing facilities increasing month after month. In this innovative sector, it’s time to rethink the approach to edge protection on these data fortresses with cutting-edge protection solutions.

Our edge protection system and precast concrete panels go hand in hand, offering a faster, safer way to safeguard your team at heights. By eliminating the need for drilling, you preserve structural integrity and speed up construction.

Let the data centres crunch the numbers while you avoid crunch time on-site with SafeSmart Access. It’s a solution that delivers results you won’t be disappointed in—keeping your project on track and your people safe.

20240826 123147 scaled

Captured process

Case study facts

Data Centres

Industry

Client

Hindmarsh Constructions

Location

New South Wales

Status

Installed on site

Capability

Non-drill precast edge protection

Delivery Model

Custom design with engineering review and supply

Material

Material

Related case studies

M4 AdaptaSpan Installation

Temporary Guardrails for Warringah Freeway Sound Walls

SafeSmart Supporting the Western Tunnelling Package at Rosehill

NON-DRILL Handrail at Tamborine Mountain

Related case studies

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Next action

Have a similar access challenge? Talk to SafeSmart about your project.