The Challenge

SafeSmart helped BESIX Watpac manage changing edge protection requirements at the Shellharbour Hospital project with AdaptaPanel WorkThru.

BESIX Watpac’s main hospital works involved more than one simple perimeter. The site included voids, ties, changing work fronts and locations where crews needed to work through to the edge.

Edge protection for a changing workface

The site needed an edge protection system that could respond as construction progressed.

Crews needed to access the workface through the edge protection while maintaining protection around the slab, voids and changing site conditions. A fixed arrangement would not provide the same flexibility across every work area.

The required solution needed to keep protection in place while allowing workers to access the task through the panel.

Scaffolded hospital structure and guarded slab edge at Shellharbour
Facade installation beside scaffold and edge protection at Shellharbour Hospital
The Solution

SafeSmart reviewed AdaptaPanel WorkThru against traditional edge protection products. WorkThru provided the better fit for the project because the mesh could be removed where access was required.

Sliding toe boards also helped the system adjust around ties, columns and void protection. This allowed the edge protection arrangement to respond to the work without requiring unnecessary workarounds.

With engineering support behind the layout, the project received a compliant system that matched the work areas and the way crews needed to operate.

Coordination from planning to installation

SafeSmart worked with the contracts team, site managers and project managers to ensure the system was understood across the project.

Once the equipment was delivered, the SafeSmart team spent half a day on site with the installers. The session demonstrated how to install the system and helped the crew understand how to use it correctly.

This practical support connected the design intent with the installation process. It also gave the installers an opportunity to work through the system before applying it across the site.

Close view of an AdaptaPanel WorkThru panel at Shellharbour Hospital
Site team beside temporary edge protection at Shellharbour Hospital
The Outcome

AdaptaPanel WorkThru helped BESIX Watpac maintain edge protection while allowing crews to access work areas through the panels.

Removable mesh and sliding toe boards gave the system the flexibility required around voids, ties and columns. Engineering support and on-site installation guidance helped the system match the work and reduce reliance on improvised access arrangements.

For projects where the workface changes as construction progresses, edge protection needs to keep up.

Speak to SafeSmart about AdaptaPanel WorkThru for voids, ties, changing work fronts and access through the edge.

Site team inspecting access and facade works at Shellharbour Hospital

Captured process

Case study facts

Building

Industry

Client

BESIX Watpac

Location

New South Wales

Status

Installed on site

Capability

Adaptable slab and void edge protection

Delivery Model

Engineering support, WorkThru supply and installer demonstration

Material

Material

Related case studies

M4 AdaptaSpan Installation

Temporary Guardrails for Warringah Freeway Sound Walls

SafeSmart Supporting the Western Tunnelling Package at Rosehill

NON-DRILL Handrail at Tamborine Mountain

Related case studies

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Access platforms for process plant upgrade

Custom steel platforms and stair systems delivered nationwide.

Next action

Have a similar access challenge? Talk to SafeSmart about your project.