North West Rail Link

North West Rail Link

North West Rail Link Contractor TJHD JV commissioned SafeSmart to proceed with the manufacture of the Cross Passage access platforms. These platforms will be used for walkways and access into the cross passages as well as providing loading docks for equipment and materials. Over 6 metres in length, these platforms can be joined to allow continuous, unobstructed access.

You Might Also Like

20260323 124150

AdaptaPanel WorkThru Edge Protection New Features

AdaptaPanel WorkThru Edge Protection New Features SafeSmart’s AdaptaPanel WorkThru gives crews a way to access the workface through edge protection when fixed panels would restrict installation. The